Persist the exploration, proposal, spec, design, tasks, and verify/archive reports produced during the multi-device EQ, alarm-countdown, and notification-visual-polish SDD cycles.
23 lines
822 B
YAML
23 lines
822 B
YAML
change_name: pre-notice-live-countdown
|
|
status: archived
|
|
archived_date: 2026-06-30
|
|
verdict: PASS WITH WARNINGS
|
|
critical_issues: 0
|
|
|
|
artifacts:
|
|
proposal: proposal.md
|
|
spec: specs/alarm-pre-notice-countdown/spec.md
|
|
design: design.md
|
|
tasks: tasks.md
|
|
apply_progress: (completed in previous phase)
|
|
verify_report: verify-report.md
|
|
archive_report: archive-report.md
|
|
|
|
completion_notes: |
|
|
All 4 in-scope implementation/code-inspection sections (1-4) are complete and correct.
|
|
Critical correctness gate (slot 9 via AlarmScheduler.requestCode formula for both arm and cancel)
|
|
is verifiably satisfied. Flutter analyze clean. Diff scope: 91 lines (Kotlin-only).
|
|
|
|
Manual device QA (section 5) is a follow-up item, not blocking archive.
|
|
Documented warning: Manual/device QA should be run before/shortly after merge.
|