Close the SDD cycle: verified pass with warnings (0 critical), slice 1
cancelled with SDK evidence, slices 2-3 shipped, post-verify dispose
fix landed. The native-alarms capability spec is promoted to
openspec/specs/ with the corrected FGS requirement. Phase 5 on-device
QA remains the pending human gate.